June, 2003

June was a good month.  I'm starting to get the hang of this and making some progress.

 

Since I was going to be starting on the footboxes, I borrowed an engine lift from Bob in Boca, and got the engine out of the car.  Here's what it looked like when I got the car.  The cleanup was done, but a few parts, and most of the bolts that I needed are missing.

      

After talking to a couple of drivers, I removed the donor rack and swapped it for an 18:1 manual steering rack.

Then I started to work on the footboxes.  Passenger side took about a week to complete.  Drivers side took a bit longer.  Lots of drilling and trial fittings before I started to finalize the install.  Even after all that, the last panels are still not lined up...so a few more holes were needed. 

I also installed the upper & lower steering shaft, the rag joint eliminator and finally installed the steering wheel.  This was primarily so I could get a picture of me in the car.  It was a nice sense of accomplishment. 

Somehow, it looks more like a car with the steering wheel installed.

 

Check out the Russ Thompson accelerator pedal with matching brake & clutch pads.  It would have been easier to install if I hadn't  already installed the outside panel of the footbox...but that would have been too easy.